Project Overview: Objectives: The project aimed to construct a new control room building that would serve as the operational hub for EGA’s facilities. The building was to be designed and built to the highest standards, reflecting EGA’s status as a leading…
Supply and Installation of 30 KVA UPS in Port Line 5A & 5B
Project Overview: Objectives: The project was aimed at enhancing the power backup systems for EGA’s port lines 5A & 5B. The primary objective was to supply and install a reliable 30 KVA Uninterruptible Power Supply (UPS) system to ensure continuous operations…
Landscape For Proposed Villa 01 & 02 At Zabeel Dubai UAE
Project Overview: Objectives: The project’s primary goal is to create a luxurious and sustainable landscape for two high-end villas in Zabeel, which aligns with Dubai’s reputation for world-class property developments. The landscaping is intended to enhance the aesthetic appeal and functionality…
Case Study: Pump Station Upgrade
Project Overview: Objectives: The objective for the Pump Station Upgrade project at Abu Dhabi Airport was to modernize the existing pump systems to enhance efficiency, ensure reliability, and meet the increasing demands of the airport’s operations. Challenges: Strategies Employed: Results:
Case Study: Cable Tunnel Ventilation System
Project Overview: Objectives: The primary objective of the Cable Tunnel Ventilation System project was to develop a robust and efficient ventilation system for the cable tunnels at EGA’s Jebel Ali site. The project aimed to ensure operational efficiency, safety, and compliance…