New Control Room Building

Project Overview:

  • Client: EGA (Emirates Global Aluminum)
  • Location: Jebel Ali, Dubai UAE
  • Completion Date: August 2021
  • Scope of Work: Civil and architectural construction works, Interior Design & Fit-out works, External elevations finishes, Landscape and Hardscape works, Electrical Works including lighting, power, low current systems, telephone, fire alarm, and Mechanical Works including plumbing, drainage, HVAC, fire fighting.

Objectives: The project aimed to construct a new control room building that would serve as the operational hub for EGA’s facilities. The building was to be designed and built to the highest standards, reflecting EGA’s status as a leading global aluminum producer.

Challenges:

  • High Technical Specifications: The control room required state-of-the-art electrical and mechanical installations to handle the complex operational needs.
  • Aesthetic Harmony: The exterior and interior design had to align with EGA’s corporate identity while providing functional efficiency.
  • Environmental Conditions: The construction had to withstand the harsh environmental conditions typical of the region.

Strategies Employed:

  • Innovative Design Approach: Collaborated with architects to design a building that was both aesthetically pleasing and highly functional.
  • Advanced Construction Techniques: Utilized modern construction techniques to meet the technical requirements of the building.
  • Sustainable Practices: Implemented eco-friendly practices in the selection of materials and construction methods.

Results:

  • State-of-the-Art Facility: The new control room building provided EGA with a cutting-edge facility equipped with the latest technology.
  • Corporate Image Enhanced: The building’s design and finishes reflected EGA’s corporate image and commitment to excellence.
  • Durability: The construction methods used ensured that the building was equipped to withstand local environmental conditions, ensuring long-term durability and reliability.