Project Overview:
- Client: EGA
- Location: Jebel Ali, Dubai
- Completion Date: July 2020
- Scope of Work: Civil construction works, Electrical works including lighting, power, and telephone systems.
Objectives: The project was aimed at enhancing the power backup systems for EGA’s port lines 5A & 5B. The primary objective was to supply and install a reliable 30 KVA Uninterruptible Power Supply (UPS) system to ensure continuous operations and safeguard against power disruptions.
Challenges:
- Operational Efficiency: Installing the UPS without disrupting the busy port operations.
- Technical Precision: Ensuring the UPS systems were integrated seamlessly with the existing power and telecommunications infrastructure.
- Environmental Factors: Conducting installations in a port environment, where conditions such as humidity and saltwater could affect equipment performance.
Strategies Employed:
- Detailed Project Planning: Engaging in meticulous planning to schedule installations during low-activity periods at the port.
- Technical Expertise: Utilizing highly skilled electricians and engineers who specialized in complex electrical installations.
- Quality Control: Stringent testing and quality assurance processes to ensure the UPS systems met all technical and operational requirements.
Results:
- Enhanced Power Reliability: The new UPS systems provided a robust power backup solution, increasing operational reliability for the port.
- Seamless Integration: The UPS systems were integrated without any interruptions to port operations, maintaining full productivity during the installation.
- Durability and Performance: Post-installation evaluations confirmed that the UPS systems performed optimally despite the challenging port environment.