Case Study: Cable Tunnel Ventilation System

Project Overview:

  • Client: EGA (Emirates Global Aluminum)
  • Location: Jebel Ali Dubai
  • Completion Date: March 2013
  • Scope of Work: Civil construction works, Electrical works including lighting, power, fire alarm, and detection system, and Mechanical works including HVAC and fire fighting.

Objectives: The primary objective of the Cable Tunnel Ventilation System project was to develop a robust and efficient ventilation system for the cable tunnels at EGA’s Jebel Ali site. The project aimed to ensure operational efficiency, safety, and compliance with regulatory standards.

Challenges:

  • Complex Design Requirements: The project demanded a ventilation system that could fit within the spatial constraints of the existing cable tunnels.
  • Safety Standards Compliance: Stringent safety regulations require sophisticated fire alarm and detection systems.
  • Operational Continuity: The need to maintain uninterrupted operations at the facility during construction posed significant logistical challenges.

Strategies Employed:

  • Collaborative Planning: DECPBC closely collaborated with EGA to design a ventilation system that met the spatial and operational constraints of the cable tunnels.
  • Advanced Safety Systems: Implemented state-of-the-art fire detection and HVAC systems to meet rigorous safety standards.
  • Phased Construction Approach: Adopted a phased construction approach to ensure minimal disruption to EGA’s operations.

Results:

  • Efficient Ventilation System: Successfully installed a ventilation system that significantly improved air quality and temperature regulation within the cable tunnels.
  • Enhanced Safety: The new fire alarm and detection system greatly improved the safety of the facility.
  • Operational Success: The project was completed on time without any significant disruption to EGA’s ongoing operations.

Results

  • Client: EGA (Emirates Global Aluminum)
  • Location: Jebel Ali Dubai
  • Completion Date: March 2013
  • Scope of Work: Civil construction works, Electrical works including lighting, power, fire alarm, and detection system, and Mechanical works including HVAC and fire fighting.